Earth Works

 

 

 

LIST OF PROJECTS

 

 

 

 

 

 

 

 

 

Project

Name of Project

Name of Client

Name of consultant

Type of work

Contract Amount in MNDhs

Commencement Completion

1. AD401 

Development of Camel Race Tracks at Ras Al Khaimah and Umm Al Quwain

Al Ain Municipality

Freeman Fox International

Earth works and Structures

27.67

04/07/1993 02/11/1993

2. AD411a

Test Asab Gas Development Project - Phase I and II

Snamprogetti /Granite Construction Company

Sir Alexander Gibb and Partners

Earth works plus Sand Levelling / Filling for New Gas Plant as well as Road works and Hard Standings at Gas Plant area.

24.96

01/01/1998 30/04/2000

3. AD433a

Earth filling, Levelling and Access Roads at Al Jabeeb, Shawamekh, Al Reef Hiliya and Al Falah.

WD filling Section

AlSweidi

Earth filling, levelling, Farm Access Roads, Hard standings and Sand levelling works

32.50

01/08/2001 15/03/2002

4. AD427 

Water Tank Mounts at Seih Al Sidirah (Ashoosh)

Al Ain Municipality/Pauling M.E

Diwi Consult

7 No. Earthen Platforms 120,000 m3 each dressed with stone Rip Rap and Asphalt Access Roads

9.50

21/07/2001 25/03/2002

5. AD424

Ajban Tree Plantation Reem Island - Structural Fill

Works Department

AlSweidi

Transport sweet sand and spread & level in designated areas

9.15

01/03/2001
30/06/2002

6. AD435

Filling at Al Dhafrah air Base Zone 1B Contract MW-241-2001

Directorate of Military Works

Stanley Consultants

General Filling and Earthworks formation for Runway & Taxiways

29.95

06/05/2002 25/12/2002

7. AD444

Unleaded Gasoline/Low Sulphur Gas Oil Refinery at Ruwais - Site Preparation Works

Granite/Technip - Colflexip

Technip-Coflexip /Takreer

General Levelling and Platform Preparation for the N ew Refinery

8.55

15/11/2002
15/03/2003

8. AD493

Amiri Flight Package 1 - Advance Earth Works

Amiri Flight

Halcrow International

Extension of Aprons at Amiri Flight 800 M2 Cut/Fill Formation of 450,000 M3 General Imported Fill 250000 M3, Minor Fencing And Access Roads

11.81

07/10/2002 30/03/2003

9. AD441

Shuweihat Water Transmission Scheme - Lot B Pipeline Earthwork

Marubeni/Taisei Corporation

Tebodin Middle East Ltd

Construction of Earth Bund for Pipes with adjacent Access Roads Approx. 6,000,000 M3 Excavation of Pipe Trench 120 km for 2 No. 1.6M Dia

137.60

01/01/2003 31/05/2004

10. AD453

ADWEA Contract No. N 2257 - Interconnection of ADCO / TRANSCO Power Networks Lot 2 Overhead Lines 400 KV and 220 KV Overhead Transmission Lines Access Road/Platform works

ADWEA / KEC International Limited

Lahmeyer International

Construction of 90 Kms Gatch Access Road (4m) and 450 No. Gatch Platforms (35m x 35m) for Overhead Power Transmission Lines from Shuweihat upto Madina Zayed

9.71

31/12/2004 13/11/2005

11. AD459

ADISC Residential, Leisure and Commercial Compound      Enabling Works

Private Property Management

Private Property Management

Unclassified Excavation, Load Bearing Filling for Roads and Non Load Bearing General Filling and other associated works.

8.50

07/07/2007 07/09/2007

12. AD464

Paris- Sorbonne University Abu Dhabi, Al Reem Island - Structural Fill

Al Habtoor-Murray & Roberts Joint Venture

Parsons International Ltd

Excavation, Ground preparation and Structural Backfill including material testing and monitoring by PBT's and CPT's for building construction platform.

25.00

22/05/2008 30/09/2008

13. AD487c

P030 Zayed National Museum - Package C06: Construction of Remote Service Facility and Main Building Substructure works.

Al Habtoor-Murray & Roberts JV

WSP

Structural Earthworks and Drainage Works for Enabling Works to Sub Structures

5.00

20/01/2011
20/05/2011

14.AD426

Al Raha Sand Filling

Works Dept.

Works Dept.

Import Red Sand and Spread/level in designated areas.

 

1.00

23/05/2001

13/06/2001

15.AD430

Miscellaneous Filling Works

Works Dept (Filling Section)

DiwiConsult

Various earth filling, leveling and haulage jobs issued through work orders in Abu Dhabi vicinity within 100 km radius

30.00   (approx.)

22/06/2002

21/06/2003

16. AD441

Shweihat Water Transmission Scheme – Lot B Pipeline Earthwork

Marubeni/Taisi Corporation

TebodinMiddle East Ltd.

Construction of Earth Bund for Pipes with adjacent Access Roads approx.. 6,000,000 m3 Excavation of Pipe Trench 120 km for 2 No. 1.6m dia.

137.60

01/06/2003

31/05/2004

17. AD443

AmiriFlight Package 1 – Advance Earthworks

AmiriFlight

HalcrowInternational

Extension of Aprons at Amiri Flight 800 sqm Cut/Fill formation of 450,000 m3 general imported fill 250,000 m3, minor fencing and access roads.

11.81

07/10/2002

30/03/2003

18.AD499a

Expansion of the Abu Dhabi International Airport – Capacity Enhancement Programme : Earthworks for Building Pad

ALEC

Ghalari

Earthworks for US Customs & Border Protection (CBP) Facility at Terminal 3 Abu Dhabi International Airport .

4.85

01/08/2012

31/12/2012