Marine Works

 

 

 

LIST OF PROJECTS

 

 

 

 

 

 

 

 

 

Project

Name of Project

Name of Client

Name of consultant

Type of work

Contract Amount in MNDhs

Commencement Completion

1. AD414

Breakwater Developments Contract No 987

Abu Dhabi Municipality

DeLeuw Cather International Ltd

Phase-I infrastructure for Abu Dhabi Breakwater development.

76.84

15/04/2000
30/06/2001

2. AD421

Private Palace at Ghantoot Site No. 254

Al Habtoor/Sheikhk Zayed Private Department

Architectural & Engineering Consultant

Earthworks, Riprap, Sea Protection Lining works and Road Works

4.70

01/03/2001
15/11/2001

3. AD436

Al Raha Beach Resort - Abu Dhabi Marine Works

Al Habtoor for Private Department

DMJM/TEST

Land Reclamation, Construction of Sea Wall, Reshaping Sea Bottom to form Beach and Construction of New Breakwater and Create small craft Marina Slipway and Bunkering Station.

14.65

16/06/2002
31/03/2003

4. AD449

ADWEA Contract No. G1046 400 KV Over Head Line from E48 to Mussafah

ADWEA / KEC International

PB Power Limited

Provision of 12 No. Island Platforms and 4.0 Mtr clear width Access Road to the Island Platforms from Substation E48 ( East Corniche) upto Umm Al Naar Island.

7.36

08/05/2004
01/03/2005

5. AD451

Jetty Upgrade - Jebel Dhanna Contract No. 6115.01/EC 10549

ADCO

ADCO

Upgrade of Jetty and Roll-On Roll-Off Slipway Ramp with Shore Protection, Sheet Pilling, Associated Road Works and Rehabilitation of Terminal Building

15.40

07/02/2004
11/05/2005

6. AD446A

Dredging and protection of dredged material - Contract No. 6653.01/EC 10651

Abu Dhabi Company for Onshore Oil Operations (ADCO)

ADCO

Access Channel - CPP Jetty at Al Dabbiya, Dredging and protection of dredged material

2.44

16/04/2005
23/03/2006

7. AD473a

Mugharraq Port Construction

Department of Municipal Affairs Western Region Municipality

Euroestudios

Rehabilitation work for Marsa Mugharraq Port Phase 1, 2 & 3: Construction of 260m long Jetty consisting sheet pile foundations with reinforcement concrete making facilities to accommodate 5 ships at a time. Also construction of slipway for fishermen.

35.50

13/12/2009
31/03/2011

8. AD477

Sadiyat Edge Protection works (SB18, 20, 21 and 22)

Tourism Dev. & Investment Co. (TDIC)

Parsons International Ltd.

One Km of Sea shore revetment and land reclamation.

12.00

14/06/2009

12/07/2012